City Axis and Conditioned Environment partnered to deliver a full Cat A /Cat B refurbishment of Kings College London Mathematics School.
This included the replacement of all dysfunctional heating and cooling systems with a combination of high efficiency boilers and heat pump technology for the class and science rooms of the school.
Crucial to this scheme was the relationship with the client and its aim to lower the school’s energy emissions. Installation of heat recovery technology within the existing air handling plant, new heat pumps systems to service the theatre and new AHU’s resulted in a 30% reduction in energy levels upon completion of the project.
To complete in preparation for the start of the academic year, a fast track delivery within a six-month timeframe was crucial. Detailed plans were also provided to ensure that all the services and supplies that the NHS surgery required to remain operational were maintained whilst work was carried out.
Upon completion of the project a 30% reduction in energy levels was achieved.