020 8453 1010 Menu

Upon completion of the project a 30% reduction in energy levels was achieved

City Axis and Conditioned Environment partnered to deliver a full Cat A /Cat B refurbishment of Kings College London Mathematics School.


This included the replacement of all dysfunctional heating and cooling systems with a combination of high efficiency boilers and heat pump technology for the class and science rooms of the school.

Crucial to this scheme was the relationship with the client and its aim to lower the school’s energy emissions. Installation of heat recovery technology within the existing air handling plant, new heat pumps systems to service the theatre and new AHU’s resulted in a 30% reduction in energy levels upon completion of the project.

To complete in preparation for the start of the academic year, a fast track delivery within a six-month timeframe was crucial. Detailed plans were also provided to ensure that all the services and supplies that the NHS surgery required to remain operational were maintained whilst work was carried out.

Upon completion of the project a 30% reduction in energy levels was achieved.

Location
London

Name of Partner
City Axis

Name of Building
Kings College London Mathematics School

Size
Undisclosed

  • HVAC systems tick
  • Commercial plumbing tick
  • Maintenance tick

This whole refurbishment project was delivered in a quick and efficient way, leading to the school reducing their energy emissions by an impressive 30%.


Latest News

Why is indoor air quality so vitally important in 2021? Here we look at what indoor air quality is and how improving it will help us beat COVID-19 transmission. Simply...

Latest Post

Our Work

Take a look at some of our projects and see what our clients say about our services and how we add value.

View Our Work

Top